Tsiko Hospital OB wing construction
109 photos
-
Start of OB wing construction
-
OB wing
-
OB wing
-
Drainage under OB wing
-
OB wing
-
Getting the plumbing in place
-
Sure wish we had a redi-mix!
-
OB wing
-
Extending the wing
-
Backfilling.
-
Forming up the drainage ditch
-
Packing in that fill dirt
-
End view of drainage ditch
-
Thanks to the aviation ministry, a tractor is available
-
Removing the old exit from the men's ward
-
Putting in fill for under the floor
-
Old exit from men's ward
-
still more fill needed
-
Getting ready to pour cement
-
Everything is in place for the pour
-
All our blocks are made by hand!
-
First load of cement poured
-
Making some progress with the cement
-
Oh, man is this wheelbarrow heavy!
-
Finally the last load of cement!
-
Hey come here, do you want to see this finished?!
-
THE Crew!
-
Another step closer to having that OB wing
-
Waiting for wall for the OB wing
-
Continuation of Maternity wing
-
2 Feb 2010
-
2 Feb 2010
-
2 Feb 2010
-
2 Feb 2010
-
2 Feb 2010
-
2 Feb 2010
-
Figuring out where the parts go
-
CWE crew 1 to help with Maternity wing construction
-
3 Feb 2010 a
-
3 Feb 2010 b
-
3 Feb 2010 c
-
Start of tile work and plaster inside 05 02 10
-
Start of tile work and plaster inside 05 02 10
-
Stone work 9 02 10
-
Stone work a 09 02 10
-
Trusses in place 09 02 10
-
Tile work in Nursing Statrion area 09/02/10
-
Where does that go!
-
Tile going down in Labor & Delivery area 10/02/10
-
Wall tile work in Labor & Delivery 10/02/10
-
Preping wall for tile for Labor & Delivery area 10/02/10
-
Preping wall for tile 10/02/10
-
Finished roof and almost finished wall 11/02/10
-
Maternity wing 11/02/10
-
Outside of new maternity wing 11/02/10
-
Finishing touches before ceiling work 15/02/10
-
Mason hard at work 16/02/10
-
More tile going down. 15/02/10
-
Some of the wall stone work
-
More ceiling going up 22 02 10
-
Part of 4th wk crew from CWE 22 02 10
-
Ceiling going up! 18/02/10
-
Happy member of 4th crew 22 02 10
-
More happy crew member from CWE 22 02 10
-
Making the ceiling fit with the paint job 22 02 10
-
Our security finally caught up with this character 22 02 10
-
Who says electricians can't work sitting down 22 02 10
-
Putting up that great looking ceiling 22 02 10
-
Electrical crew working after ceiling crew 22 02 10
-
Part of 4th wk crew from CWE 22 02 10
-
Making the ceiling fit with the paint job 22 02 10
-
Cabinets being made for Maternity wing 22 02 10
-
Sanding is much easier with a machine 22 02 10
-
Beautiful paint job 22 02 10
-
All that sanding for those cabinets in the maternity wing 22 02 10
-
Tile work almost finished 25 02 10
-
Maternity wing almost finished 25 02 10
-
Carpenter supervisor 25 02 10
-
Donated bed from Mary Jo's former hospital in Michigan 26 02 10
-
Maternity ward almost finished, Nurses station needs to be installed 26 02 10
-
Finished cabinet in Labor & Delivery area 26 02 10
-
Installing L & D cabinet 26 02 10
-
Mary Jo teaching how to use the new bed 26 02 10
-
Empting container of new beds destined for OB wing
-
Bet you never cleaned a bed like this
-
Getting the new bed cleaned up
-
On their way to the new OB wing - 1
-
More new beds for the OB wing
-
Where should we put this bed
-
Ahhh, new beds at last in the new wing
-
I didn't think it was going to go there
-
Finishing touches to OB wing
-
John Teusink making last minute adjustments
-
Steve making a repair to one of the OB beds
-
Carpentary staff with new Nurses Station
-
Making sure the drawers are correct!
-
Opening remarks - 2
-
Signing praises during dedication
-
Steve opening remarks, with Jo & Todd DeKryger
-
Listening to other remarks
-
Pastor Togbé's dedicatory prayer 15 March 2010
-
Some of new moms and babies in new OB wing
-
Getting mom and baby settled into new OB wing
-
Getting mom and baby settled into new OB wing - 2
-
Getting mom and baby settled into new OB wing - 3
-
Helping mom and baby into new OB wing
-
Mingling of staff
-
L & D area with midwife and staff
-